Results (
English) 1:
[Copy]Copied!
The contractor must provide the equipment, machinery and materials of the contractor are stated in the contract and the entire staff, consumable materials and supplies along the other service, although things are temporary or permanent nature, be required in and for when construction and repair errors.
Being translated, please wait..
