June 23, 2016, the company has written EGATi 111, together with the report records a feasibility study (FS) of thermal power plant project in Quang Tri 1 (project) was completed on the basis of pressure Its on supercritical technology.
to have enough evaluation basis, the Ministry of Trade for consideration and approval of the feasibility study report of the project, the General Department of Energy suggest Corporation electrical engineering consultants 1 research expeditiously complete the verification report of the project FS. During the verification process, the proposal JSC Electric Construction Consulting 1 note updating the current regulations concerned and the opinion of the General Department of Energy in Document No. 11, December 17, 2015.