Results (
English) 2:
[Copy]Copied!
Avil said storage location at Khang Lang unfavorable, if stops at Khang Lang will not take advantage altitude, reduce market access kar Laos and Thailand. To increase the efficiency of the project, Avil propose extended to pipeline from Khang Lang Thakek (and possibly to Vientiane). Along with that, to reduce construction costs and facilitate the operation of the project, Avil proposal Lao government to prioritize the allocation of land in the warehouse at Thakek according to the parameters, characteristics consistent with the project conditions: flat, easily accessible, ensuring a minimum size of 500 x 900 m.
Being translated, please wait..