Results (
English) 2:
[Copy]Copied!
ON THE PROJECT AREA SITUATION I. NATURAL CONDITIONS 1. Terrain park planning land is hilly terrain should be somewhat reinforced floor plan suited for each area (from the top down to the foothills) to design matching utility works. Altitude out The highest spot Condition: Lowest: Average: As a whole each area should razed and leveled high lowlands. 2. Hydrology The annual rainfall: Groundwater level: The water level upstream down annually: Dry season: Rainy season: 3. Geology The land planning according to a preliminary assessment of the hills and uneven ground levels the load bearing capacity on the ground and the mountains should be prepared carefully to ensure surveying and soil foundation construction. II. LAND USE STATUS 1. The total current use of land: 120 ha 2. Current status of construction: 3. Current status of primary forests and to restore forests entire project area ecotourism park at the disposal of Bui Thi Hai Chau. III. OVERALL RATING 1. Advantages - The status of the project area is mountainous, convenient transportation, the area developed under the master plan. - Power supply, sewerage and waste water. 2. Difficulty - ecological garden stays in the construction and planning of greenery ---- higher cost - optic cable systems No - The land - to get an overview to break ground each area suitable for the scale of investment in the project category. Categories of works:
Being translated, please wait..
