DECLARATION OF EQUIPMENT TABLE
Contractor may only declare the principal construction equipment to meet the requirements for equipment as mentioned in the list at the request specified in Section 2.2 Chapter III- point b Evaluation criteria Bid prices that can be readily mobilized for bidding packages; not been declared and the equipment was mobilized for other bidding packages mobilization time period coincides with the implementation of this package. Where the declaration is untruthful, the contractor will be considered cheating.
Equipment must be owned construction by contractors or can go rent but the contractor must demonstrate the ability to mobilize to meet the requirements of thau.Truong package of lease, it must have equipment lease contracts and documents proving the equipment owned by the lessor. Contractors must be declared in the form below for each device: