Results (
English) 2:
[Copy]Copied!
The two sides agree to the actual volume of the B acceptance has completed the installation and operation of geotechnical instrumentation for the contractual parties A JPS / GIV / 2015-1010 dated 02.11.2015 with blocks the following amounts:
Being translated, please wait..