Below are the results for the calculation of traffic at building CJ Building with 6 scenarios. Only the sixth scenario is acceptable, while the other scenario shows the building's capacity more than the overall haul of 4 lifts. However, to improve in comparison with the current situation, the results show: tags 2 Elevator C & D not down 2 walk-in hour will significantly improve. To do this, on the Schindler has 1 solution is to use Lobby Vision to tags from time to time defaulted and have adjustable, the cost for the building's scale is 5 480 million (not including VAT) Compared with the results of the 2009 analysis from Jardine Schindler Hong Kong, the above solution is also recommended