Results (
English) 2:
[Copy]Copied!
To cater to the calculation, analysis and comparison, the Consultant has conducted water sampling at the position expected construction revenue - raw water pumping station on the Red River at the time of the month 7/2016. The analytical results are given in the table below
Being translated, please wait..
