Results (
English) 1:
[Copy]Copied!
THE SITUATION STATUS PROJECT AREAI. NATURAL CONDITIONS1. TopographyThe land planning of terrain is hilly should need planning backbone background fit under each area (measured from the top down to the foot of Mount) to design consistent with the use of works.The current state of the highest spot height: lowest: average:On the whole each area to flatten and elevation leveling sunken land.2. HydrographyAnnual precipitation:The underground water level:The water level upstream poured down each year:Dry season:Rainy season:3. GeologyPlanning of land according to the preliminary evaluation is hilly land at its uneven background load resistance on the ground and the mountain should be prepared on survey techniques to ensure the foundations and ground construction.II. CURRENT STATUS OF LAND USE1. General status quo 120ha land use:2. Current State of construction: 3. The current state of forest and jungle are recovered the entire land area of the ecotourism project in the right use of Ms. Bui Thi Hai Chau.III. GENERAL EVALUATION1. Advantageous-The current state of the project area is hilly, convenient transportation, is developing according to overall planning.-Power supply, drainage and sewage.2. difficulty-Ecological gardens remain in the planning and construction of green---- higher increase costs-System of optical cable not-Terraces-to get the overview to each region in accordance with the scale of investment project category.Projects:
Being translated, please wait..
