Results (
English) 2:
[Copy]Copied!
For the requirements of ISO 9001: 2008, the company applied for a primary process, which is managing the investment project construction (special process). To ensure the quality of the construction items, the company organizing capacity assessment of the process through the following ways:
- Identify the necessary standards to provide a basis for consideration and evaluation of product quality ;
- Assessing the capacity of the personnel and equipment were mobilized, the appropriateness of the method or the quality of the materials used for the implementation of investment projects;
- Using method conformity assessment;
- Storage full record of the results confirm the competence of personnel (eg the relevant certificates of the personnel of the organization design consulting, advisory supervision and the contractor public), methods (procedures related), equipment (inspection records construction equipment), evaluation results (design dossier), test results (of the model), Profile of test results used materials.
In case of need, the company can hire a quality assessment organization works independently and reputed to conduct validation of the value of use work items are completed.
Being translated, please wait..
