Results (
English) 1:
[Copy]Copied!
The SOCIALIST REPUBLIC of VIET NAM
Independence – freedom – happy
---------oOo---------
PURCHASE AGREEMENT
(V/v: traded rosewood)
number: 007-2014/HĐMB
-based on the Ordinance on economic Contracts 25-09-1989 by the State Council.
-pursuant to the Civil Code of the Socialist Republic of Vietnam no. 33/2005/QH11.
-Based commercial law No. 36/2005/QH11 on 14-06-2005.
-based on the agreement and unity of the two contracted units.
today, August 2014. At his Tp.HCM, represented the two Sides include:
SIDE a: (called the seller)
SIDE b: (called la buyer)
address:
phone: Fax:
VND account:...........................................................................................
USD: ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
represented by:-position:
after the debate, by the Council uniform contracting economy to buy goods with the content to be expressed in terms such as the following:
ARTICLE i: CONTENT JOBS
-Party A agrees to sell to party B according to rosewood shipments here:
ARTICLE II: SPECIFICATIONS-QUANTITY-PRICE-quality-CHECKED
No longer specifications Item Dimension
CM Quantity (m3) Uni price FOB POLYCYSTIC
(USD) Amount (US $)
I
rosewood Laos 15-19cm (15%)
20-35cm (62%)
36-50 cm (20%)
51-90 cm (3%) 1.80-2 m
33.000 3500
the total value of the contract : .
The weight Exchange: 1mét block of rosewood = 1, 300kg (one thousand three hundred Kg)
price: FOB DA NANG
:
wood quality-price, specifications, quantity, quality, inclusive of taxes and shipment fees. Mutual consistency does not change until the wood is delivered to side B.
-wood quality:
-Wood stick sensory corner but not more than 5 cm (5 centimeters) (hug), empty no guts, no categories, no fire, no dead eyes, the experienced no more than 17 degrees, has small crack commandments (tingle wind), the length of the trace the commandments do not exceed 5 cm (5 centimeters), a width of not more than 5 cm, 0 tingle stain (0.5 centimeters) from the top two. The sensory, sensory edge each side allowing 3%; cracking the top of each no more than two toét 5% for weight, the proportion of spam from 3_5% (no more than 5%). The buyer is entitled to select rows in the criteria. Unsatisfactory goods are ignored.
-acceptance method:
--how to calculate the volume of wood: length x width x thickness of each piece of wood is.
-trials "on the number and quality of the wood 100%.
-Side B send representatives along With A monitor, test and quality control, specification of wood during delivery at wooden depot in Laos.
-trials "on the uniform checking each plate to mass or weight vehicle.
ARTICLE III: terms of PAYMENT – payment:
-after viewing the finished goods, within 3 days the buyer release payment guarantee deed (L/C) irrevocably the first deliveries is equivalent 500m3-1000 m3 after the seller receives payment release deed by the buyer.The following guarantee guarantee similar times before, within 5 days after the buyer receives the previous delivery times of Bil.In the latter case 14 days from the date the buyer comes to view items that the buyer does not release deed of guarantee the
math (L/C) irrevocably the first deliveries is equivalent 500m3-1000 m3, then the buyer must compensate the seller for damages amounts to 100.000 USD (the costs incurred for the seller).
-Once on the sale and Purchase was in number and quality, according to the minutes of trials "delivered attached. The seller delivered the wood origin records of each batch produced.When the seller completed the third water ride back to the buyer, or to go directly through the mail station 3 because the buyer specifies. The buyer paid just 100% of the value of the shipment, delivery of human reality in each phase, the payment is not delayed beyond 24 h.In case the seller will cover the set of vouchers for payment provisions of the contract that the buyer has not paid out to the seller. The seller has the right to ask the Bank issue LC by the buyer to the seller immediately preceding payment without the confirmation of the buyer. The seller must hand over the papers left immediately to the buyer (as Bill, C/O, hun, quarantine certificates, customs declarations). In the case of objective the eradication and hand over the papers be allowed to slow down but not more than 48 hours.
The document for payment Include:
-
03 original Invoice-Packing list original 03
-Paper 01 03 original infection hun copy
quarantine original 01-03 copy
-Bil Board 01 03 original copy
-01 CITES certificate original
-certificate C/O 01 original
1. Payment currency: Mutual consistency using the US dollar exchange sold at Eximbank Viet nam into VND at the time to execute the payment transaction for this contract.
ARTICLE IV: DELIVERY PROGRESS
-on the unification of deliveries made each section. each delivery apart from 15 ~ 25 days, until taken off contract.
• The amount allocated in each phase: 500m3 → 1000 m3 (± 10%).
• each subsequent delivery within 20 days.
• specific delivery time will be announced in the Appendix.
Article V: RIGHTS and OBLIGATIONS of the TWO PARTIES
rights and obligations of A Party:
1. Powers:
-required payments on time required by the contract.
-Other rights as required by the laws of Vietnam.
-responsibly informed representatives and with Side B supervised the testing of goods at the place of delivery, delivery and confirm the minutes of delivery with the volume, quality practice in delivery location.
2. Obligations:
-Delivered the right quantity, quality, Specification and time to the buyer under the contract.
-provide complete paperwork, procedures related to goods for the buyer.
-make sure the source, origin of wood sold to the buyer.
-responsible contact FX Board to pull Congtainer goods pursuant to the plan of the buyer.
-To compensation under article III (3), article VIII of this agreement;
Rights and obligations of Party B:
1. Powers:
-are required to deliver goods on time, quantity, specifications stated in this Contract and in accordance to time delivery.
-other rights as required by the laws of Vietnam.
2. National service:
-payment deadlines required by this agreement.
-Election of competent officials in order to properly time the seller notice.
-Cases the buyer does not receive or returns slowly to compensation as defined in article III (3), article VIII of this agreement.
-to inform party A to port location.
ARTICLE VI: PRICE
-The price does not change during the transaction to the end of the shipment 3.500 m3 (± 5%).
-B Side case done right as article III. 3. A, the price is retained and implemented until the contract is completed.
ARTICLE VII: litigation, proceedings, COMPLAINTS
-Zhang contractual disputes, proceedings, complaints between parties to negotiate , discuss on the spirit of cooperation and respect for the legitimate interests of each other. If not resolved, the incident will give grant the Economic Court has the authority for statutory arbitration. The court fees paid by the losing party events.
-SC case proceedings, a complaint must notify each other by formal written.
ARTICLE VIII: To PAUSE or CANCEL the CONTRACTS
1. Pause:
-the fault of the buyer or the Seller cause.
-Due in the event of force majeure.
-If must suspend the contract due to the fault of one party cause, then the suspension must send notice to the other party know within 3 days and outlined specific reasons, at the same time consulted settled on the spirit of cooperation of equality and mutual benefit. Cases on the suspension notice that stop just at work causing damage to partners they must satisfactorily compensate damage to the damaged Parties (have the valid documents prove).
-pause time contract a minimum of 10 days, a maximum of 25 days to the Party at fault to correct the problem. The time and extent of compensation for damage will do the two Sides negotiate written.
2. Cancelled:
-the buyer has the right to cancel the contract if the seller make delivery not true quality, illegal or too slow delivery time 5 working days compared with the provisions of article II, paragraph 3 of this agreement. The seller has the right to cancel the contract if the buyer made payment on 03 compared with the provisions of article III, paragraph 3 B of this agreement. Breach of contract parties must compensate any relevant losses.
-The cancellation of the contract shall promptly notify the other party about the annulment; If one does not notice that cause damage to the other party, then the Party cancelling the contract must compensate;
-When the contract was cancelled, then the contract is void from the moment of cancellation and the parties must return to the same property or payments (if any)
3. Extends the duration of the assignment:
-on the continuing new contracts or supplemented by Appendix.
-due to prolonged Agreement duration
Being translated, please wait..