Results (
English) 1:
[Copy]Copied!
Notes: When the slope along the big discounts for horizontal gradient in table above from 5-15 parts per thousand but still secured to the horizontal gradient usually not more than 15 baby voice. When the slope along the small, horizontal gradient is the change in the scope of design to the curb and road surface with a width of 1.5-2 m, rănh way to increase the road surface and drainage water revenue to the wells.
Being translated, please wait..
