The contractor provides the application for certificate of conformity according to national technical regulation QCVN16:2014/BXD. Certification units are: Institute of building materials-the Ministry of construction. In the resulting Slip test of 3997/30 PCB cement MATERIALS-TTKĐ on 22/5/2015 due to the control centre of construction materials ISO/IEC 17025:2005-003 VILAS done, missing the target by request of HSMT as: setting time; Fineness; Anhydric sulphuric content (SO3). To clarify the content, on 10/11/2015, Pmu ODA released No. 364/CV-QLDA v/v required bidders to clarify HSDT, on November 12, 2015, the contractor has answered the number 248/CV-CT attached to the documents. The contractor provides the test results of cement due to the building control center of Lao Cai province made to express the level of response of the missing criteria mentioned above. However, the building control centre of Lao Cai province is not level and also not enough competent conformity certification for contractors. So, the expert does not tender acceptance of the results of this test and still conducted reviews of the technical criteria according to the original profile
Being translated, please wait..