Results (
English) 1:
[Copy]Copied!
Appendix 3.10: report completed TDA TB Upper GroupI. BASIC INFORMATION ABOUT THE U.S. PROJECT:1. TDA Name: pump station construction Upper Group2. Owner: CTTL mining company limited Hai Duong Province.3. objectives and tasks of the project: (i) proactive flood criteria for 2,270 ha of the basin of the upper Division included a part of area of the 14 communes, including two in the city and 12 communes in the District of Gia Loc district, Hai Duong Province; and (ii) contribute to the improvement of the ecological environment in the region of the project. 4. Construction location: Gia Loc District, Hai Duong Province.5. Form of investment and projects are building:-Investment form: new construction.-The main investment categories: Upper Division scale pump station including 7 vertical axis pump aggregates, output Q = 15.5 m3/s; The drain discharge through the levees; Self drain runs through the levees; 35 kV high-voltage lines and transformer stations of a capacity of 1,360 kVA; Management area; The inner Council of the works include the construction of 4 bridges people born and strengthened Jellies Restore channel dredging-3 km-long Upper Group6. Duration: starting in 2010 and completed before 30/6/2016. 7. Total investment: total investment approved discretion to adjust, additional Minor project number 1263/QD-BNN-TCTL on 15/4/2015 of the Ministry of agriculture and rural development is: 205,653,334,000.II. IMPLEMENTATION: 1. Preparation of technical design projects:-From 2010 to 14/6/2012: unit selection advice, set up investment projects, the evaluation + investment project approval. Investment projects approved in decision No. 1404/QD-BNN-TCTL on 14/6/2012.-From 14/6/2011 to 16/8/2012: the choice of consultants, making construction drawing design + total + assessment, approval of construction drawing design + total. Investor approval of the engineering and design of estimation in decision No. 331/QD-NN-MANAGING PROJECTS on 16/8/2012).-In the quarter of 2015 and the first half of August, 2015: Up + appraisal + approval of adjustments, additions of Minor projects. Additional items approved in decision No. 1263/QD-BNN-TCTL on 15/4/2015, and in decision No 2691/QD-BNN-TCTL on 08/7/2015 of the Ministry of AGRICULTURE and PTNN.2. The work of the resettlement and compensation:2.1. The work of the resettlement and compensation of the approved initial project: Emirates-The work of resettlement and compensation begin to be implemented from 2011 and basically completed before 10/4/2013 is the moment the U.S. projects are in progress;-The work of resettlement and compensation be made quickly, conveniently and in compliance with the requirements of the safety policy of the ADB and the resettlement policy of the Government of Vietnam in the process make the work of resettlement, compensation. The dissemination of information, inventory, pay compensation, listed. has the participation and supervision of representatives who are affected and the relevant departments. The internal monitoring has also been implemented fully and regularly;-Monitoring reports has been established with full information, reflect the progress of resettlement as well as issues arise that need resolution. Data are kept in the Council District GPMB and Pmu, CPO with documents and computer data to serve the management and reporting;-The certification of land use is made in accordance with the regulations of the law. Affected households do not get stuck in the process of re-issuance of certificates of land use. -The payment of compensation for the affected households have been done. Most of the affected people were satisfied with the compensation policy. People are getting money before construction. There is no phenomenon of the construction before the people have yet to receive money. Now including with regard to the area of land is land of lost people to borrow. In general the people appreciate the benefits from the project and look forward to bringing the works soon come into operation. To date, the lives of the affected households also went slowly into the stable.2.2. The work of the resettlement and compensation of approved items adjust, additional sub-projects:Additional items include the channel leading into the upper Group and pump station works on the Channel Guide covers the entire Township Wins, and Home Town Loc with about 2 km in length. The work and tally up estimates pay a draft completed and paid for the affected about 2.20 billion. 3. Bidding and construction contract implementation:a) bidding of construction project of the upper Group pumping stations including 6 packages, which have 3 Advisory selection package, 2 construction bid packages and shopping package 01 device: -3 package: (i) prospecting, construction drawing design + estimation; (ii) supervision and installation of equipment; and (iii) audit;-2 package of construction: (i) construction of pump stations of the upper Group; and (ii) additional items, jelly and Group channels Restore-works on the channel. and-1 package of stores: supply and installation of equipment, pumps, motors and generators.In the process of tender and awarding the contract to the PMU has to comply with the regulations of the donors and the Government on DD
Being translated, please wait..
