Results (
English) 1: 
[Copy]Copied!
 
Speaking at the ceremony, Chairman of the PEOPLE'S COMMITTEE of HO CHI MINH CITY Le Hoang Quan said that the first bridge girder erection stage is very important and meaningful to the project to build the metro No. 1 line of the city. This is also an important package of decisions to the progress of the entire project.The Metro project to Ben-stream first to have total capital of 2.49 billion dollars (more than 47,000 billion) in August, 2012. By design, the long route near 20 km, passing through the District 1, 2, 3, Binh Thanh, Duc (HCM) and di An district (Binh Duong). In it, about 2.6 km going underground (3 stations) and more than 17 km height (Terminal 11). The owner, Mr. Bui Xuan Cuong, Director of the Project Management Committee of HCMC urban railway-to know, to this point the metro No. 1 line has reached 6 million hours of labor, the equipment, especially the construction cranes at construction sites are inspected auditing, well-prepared. The work expected to be finished in the year 2019 and put into use from 2020. However, this new urban rail management HCM said more than 17 km of metro line, this overhead can be operated in 2018, three years earlier than planned.
Being translated, please wait..
