Results (
English) 2:
[Copy]Copied!
'- Wall in front of the docking area: plastered wall ht 5.0 mtrs.
- Outer wall: Up to 2.7-3 Metre brick wall, rest galvanized sheet cladding upto eave level (subject to the final design of the architect).
- Inner walls: wall to be sealed up to the ceiling (fire barrier wall).
Suggest wall cladding and roof glass wool insulation to have aluminum foil and back. (PUR insulation shall only be used NOT).
Being translated, please wait..
