Results (
English) 1:
[Copy]Copied!
II. WATER DRAINAGE-The rate of covering of the sewer reaches 70-80% of the drainage basin area in the municipality, the rate of waste water the focus is collecting and processing reaches 40-50%; -The municipalities of webpages are now 32 waste water treatment stations are operated with the total processing capacity of about 700,000 m3/day and there are about 27 waste water treatment stations with total capacity 1,435,000 m3/day are in the process of designing, building and preparing to complete a number of wastewater treatment station.-DEVELOPMENT and URBAN WATER DRAINAGE INDUSTRY to the YEAR 2025 and VISION to 2050 (589/QĐ-TTg; 6/4/2016)-Goals and specific targets by 2020:-+ Expand the scope of service of the urban drainage system reaches on average over 70% of covered services.-+ 15% to 20% of the total volume of waste water in the municipality are collecting and processing standards, technical standards before discharge into the environment.-+ 100% of hospital waste water and waste water industry are standard processing, technical standards before discharge into the drainage system of the municipality or discharge into the environment.-+ 30% to 50% of the amount of sewage villages are collected and processed, the standard technical standards before discharge into the sewer system or into the environment.
Being translated, please wait..
