Results (
English) 1:
[Copy]Copied!
Net Send.Thank you for supporting the process of giving this stats table. We wish you support, Coordinator of the plant for the manufacture and import of the fastest works can help Jiang Wei.1/regarding the panels have warped the link welds, bone loss when pouring reinforced concrete leads to the phenomenon of Coppha plate deformation leading to the bulge being walled column match. Jiang Wei would be added, at present the progress of the project are very folding. There is no any reason accept and allow any work would have to appropriation (Send damaged sheets on-treatment plants-return works). Because of progress on 6/floor is very close, it seems like the right structures when removed are turning up and transplant soon.Jiang also exchanged with Mr. Free as well as please your comments. Ask the plant down support, dealing in works (Because the work does not have the qualified manpower and aluminum welding technique) or new replacement plate application. As soon as new sheet works will return the plates to the factory to edit and rotation.2/additional structures due to design changes (15th floor up) actually was about a. As to Pure, because most plant embryos waiting to enter (On November 23, 2016). So when would the remaining structures will about enough?Dự kiến ngày 03/12/2016 sẽ đổ tầng 14-15 Zone I và ngày 02/11/2016 sẽ đổ bê tông tầng 11-12 Zone II.Mr.Việt, Mr.ThoạiHỗ trợ giúp em nhé !Thanks and Best Regards
Being translated, please wait..
