Results (
English) 1:
[Copy]Copied!
Related to the heavy transport vehicles carrying supplies for the production of corrugated concrete Sungshin company, hang on to go through bridge of Anqing and the D8 in Splendora's projects have made scattered material, mud, dirt, pollution, road surface damage the road surface layer and cause loss of traffic safety. (see attached photo). Represented Splendora's urban residents had asked the Board to manage a municipality work with Sungshin company Vina, and make a claim:1) company Vina Sungshin must have measures to reduce environmental pollution for the route from the bridge of Anqing to the end of the D8 in Splendora's project (currently sungshin Vina company just watered daily that not sweeping the road dust off but only do wet road surface and have mud paste)2) road surface repairs to damaged D8 to avoid crashes for vehicles C. THE AGREEMENT:1) Sungshin Company Ltd will continue to perform on the road to the cave watering from the bridge to the end of the D8 An Khanh in Splendora's project, at the same time will make the road surface hygiene and Anqing bridge it for 2 times a week.2) To ensure a clean environment for Splendora's urban area in the calendar and lunar new year occasion, Sungshin Vina company will implement restroom clean the entire globe Anqing and the D8 before 31/12/2015 and 5/2/20163) Sungshin Company Ltd will conduct surface repair the D8 and done before 31/1/2015.
Being translated, please wait..
