Results (
English) 3:
[Copy]Copied!
Sewage collection in the whole basin, 1 and 2 of the pump to the drainage in the treatment of Xing Fang Cheng Cun station installed in Gongyuan B, social security wall.Third, as a result of sewage drainage basin on the ditch water should be no moving part with the pump and a two river basin will be collected in a different station in Yuanzhou district two area.
Being translated, please wait..