The weight Exchange: 1mét block of rosewood = 1, 300kg (one thousand three hundred Kg)
price: FOB DA NANG timber quality
:
-price, specifications, quantity, quality, inclusive of taxes and charges of
shipment. Mutual consistency does not change until the wood is delivered to the b.
-wood quality:
-Wood stick sensory corner but not more than 5 cm (5 centimeters) (hug), not empty
the intestines, no item, no fire, no dead eyes, the experienced no more than 17 degrees, has small crack commandments
(tingle wind), the length of the trace the commandments do not exceed 5 cm (5 centimeters), the resultant pattern of stain
width not more than 0, 5 cm (0.5 centimeters) from the top two. Sensory, sensory side next to each
by allowing 3%; cracking the top of each no more than two toét 5% for weight, the proportion of spam
from 3_5% (no more than 5%). The buyer is entitled to select rows in the criteria.
Unsatisfactory Goods are ignored.
-acceptance method:
--how to calculate the volume of wood: length x width x thickness of each piece of wood-
.
-trials "on the number and quality of the wood 100%
.-Side B send representatives along With A monitor, test and quality control of
, the wood way in the process of delivery at wooden depot in Laos.
-trials "on the uniform checking each plate to mass or weight vehicle.
ARTICLE III: terms of PAYMENT – payment
:
-after viewing the finished goods, within 3 days the buyer issued deed of guarantee
payment (L/C) irrevocably the first deliveries is equivalent 500m3-
1000 m3 after the seller receives payment release deed by the buyer.The following
the guarantee time is similar to the previous guarantee time, within 5 days of
the buyer get Bil Board of delivery times.In the latter case 14 days
from the day the buyer comes to view items that the buyer does not release deed of guarantee the
math (L/C) irrevocably the first deliveries is equivalent 500m3-
1000 m3, then the buyer must compensate the seller for damages amounts to 100.000 USD (the genus
expenses for the seller).
-Once on the sale and Purchase was in number and quality according to the
report on the trials completion. The seller delivered the wood origin records
's major export.When the seller completed the third water ride back to the buyer
or go directly through the mail station 3 because the buyer specifies. The buyer paid directly
100% of the value of the shipment, delivery of human reality in each phase, the payment is not delayed too
24 h.In case the seller will cover the math
bar of the document stipulated by this contract where the buyer has not paid out to the seller. Seller
has the right to request the LC issuing bank of the buyer for payment directly to the
Selling without the confirmation of the buyer. The seller must hand over the papers
left right to the buyer (as Bill, C/O, hun, a quarantine certificate,
declarations to customs). In case the payment and delivery papers are
allowed to slow down but not more than 48 hours.
the document for payment Include:
-Invoice 3 original
-Packing list original 03
-Duplicate original Paper 01 03 hun copy
-quarantine original 01 03 copy
-Bil Board 01 03 original copy
-01 CITES certificate original
-certificate C/O 01 original
1. Payment currency: mutually agreed to use the US dollar is exchanged at the Bank sold
Eximbank Viet nam into VND at the time to perform transactions
paid for this contract.
ARTICLE IV: the PROGRESS of DELIVERY
-on the unification of deliveries made each section. each delivery apart from 15 ~
25 days, until taken off contract.
• the number assigned in each phase: 500m3
• each subsequent delivery within 20 days. "
• Specific delivery time will be announced in the Appendix.
→ 1000 m3
(± 10%).