Results (
English) 1:
[Copy]Copied!
-The construction team: consisting of 2 double, 1 team, team, team, group 3, group 4, group 5 team Should ensure compliance with correct technical drawing construction to avoid the lack of materials that increase the cost of production per unit, the team also needs to enhance the spirit of savings to reduce the charges in his team.
Being translated, please wait..
