Results (
English) 1:
[Copy]Copied!
'Continue staffing increase inspection toilets and replacing damaged equipment (made from w44) <br>Strengthen inspection area canteen to reduce waste generated, 2 times / shift <br>key water valve total WC after 22h10, rebounded 5pm the following day. <br>Ongoing replace the new toilet flushing PB1,2. <br>Replace the entire conductor PB1,2 water drinking fountains. Remove the zig connect, share, no water leakage
Being translated, please wait..
