Results (
English) 1:
[Copy]Copied!
The girder viaduct construction is divided into 3 construction nose (with 3 price break beams) in Thao Dien Ward, District 2 's; Linh Trung Ward, longevity and ward, Thu Duc district. The burn has U-shaped cross-section beams were prefabricated in Miami cast District 9 (total of 4,536 burn) then transported off the field by specialized trucks. Each of the beats including 13 burning beams will be hanging on the Church and momentum into a complete span. The burning beams are linked together by permanent lock cut, glue and epoxy prestressed cable along the beams.
Being translated, please wait..
