Results (
English) 1:
[Copy]Copied!
Processing stations at the kite. the goal to raise the water to the water easily about Binh hung stations, waste water from the city's main sewage pump station, for preliminary processing is through the dc bar junk, and sand sedimentation tank (hot deep risk) have equipment for sand collectors directly. Garbage collectors stage is through 2 steps: garbage collectors lines + pit garbage directly.Power 3 pumps in pump station of copper kite is 220KW, 67m3 flow, ph.
Being translated, please wait..
