Results (
English) 2:
[Copy]Copied!
- Sewer general dirt outside the project area have made complete, simply connected to the general drainage system IPs and be led to waste water treatment plants of the zone focusing.
- Currently, IZ 02 plan for wastewater collection and treatment:
+ wastewater at the plant is processed locally and connect to the wastewater collection system of the zone to lead the wastewater treatment plant to focus.
+ the online computer directly connected to the wastewater collection system in the industrial park wastewater to lead the wastewater treatment plant to focus.
the entire waste water treatment system of the zone concentrated wastewater streams will escape into the past Temple Ba Lua and then into the receiving water of the Dong Nai river.
Being translated, please wait..
