Results (
English) 2:
[Copy]Copied!
- The depth of buried cable, cable layout, distances to work, cutting across projects and mark the work on the ground must comply with regulations,
- In exceptional cases, allowed to reduce the depth and distance cable installation as prescribed, but the cable must be placed in the pipe; - When construction is completed, a completion drawings of the entire cable.
Being translated, please wait..
