Results (
English) 2:
[Copy]Copied!
In the case of side B is not complete the delivery of the contract term, party A has the right to get back the entire cost of materials under transfer of materials. Side B of the case missing delivery, the value of L/C will decrease corresponds to the value of the goods delivered is missing.
Being translated, please wait..
