Results (
English) 1:
[Copy]Copied!
According to the draft project documents, the scheduled content deployment including: improve the monitoring system collects information on rainfall, the water level of the River, the water level of the dam reservoir and flooding situation, the equipment manages the dam Management Office at 3, the equipment in flood management center in Hue; collect information and the river by Lidar technology to build flood prevention information system General storm, complete manuals contact reservoir ... The purpose of management, effective operation of the existing dam, contribute to mitigating the damage caused by the flood inflicted on the whole of the basin through the installation of monitoring equipment and upgrade the hydro system alerts.manuals contact reservoir
Being translated, please wait..