Results (
English) 2:
[Copy]Copied!
When the sample material in the pile of container, with each pile, divest itself above materials into a flat stack size 50cm x 50cm smaller not dig a hole and squarely so that sufficient quantity of material in accordance set into a pit;
- Taking on the subgrade materials were sprayed, to dig a vertical hole and emptied the entire thickness of the material in the structure.
Being translated, please wait..
