Results (
English) 1:
[Copy]Copied!
Total capacity: 5,800 m ³/day (80% water level)Solution: separate treatment system in each factory. standard processing waste water column A-TCVN 40-2011/BTNMTStations: North West stations, 1 XD CS Q = 6,000 m3/day. The total volume expected CTR 72 tons/day. Be picked up on the issue to the Northwest (DT 0, 4ha). Then take the XL CTR CN of the province.
Being translated, please wait..
