Results (
English) 1:
[Copy]Copied!
-Dirty sewer system outside the project area in general have made complete, just connect to the sewer system of the INDUSTRIAL PARK and was led on the waste water treatment station of the INDUSTRIAL PARK.-At present, the INDUSTRIAL PARK has 2 methods of gathering waste water treatment:+ Sewage at the plant are processed locally and connect to the wastewater collection system of the INDUSTRIAL PARK to lead home the waste water treatment machines.+ The direct connection factory waste water lines into the wastewater collection system of the INDUSTRIAL PARK to lead home the waste water treatment machines.The entire wastewater after sewage treatment systems of INDUSTRIAL ZONES will escape into the stream via stream Temple of rice and then out to the source of reception of the Dong Nai River.
Being translated, please wait..
