Results (
English) 2:
[Copy]Copied!
On the basis of the bids were evaluated as satisfactory in Section 4.1; 4.2; 4.3 above, the expert group set up by the bid evaluation short list of contractors to be considered in pricing as follows
Being translated, please wait..
