Results (
English) 2:
[Copy]Copied!
In cases where the size, the actual parameters of the object construction completion drawings true to size, design parameters of the construction drawings approved, construction contractors can capture drawings execution and completion drawings stamped under the provisions of this Annex on drawing sheets that.
If the size, actual construction parameters have changed in comparison with the size and parameters of the construction drawing design approval of the permit for construction contractors to record the number of dimensions, the actual parameters in parenthesis beside or below the size value, the old parameters in this drawing sheet.
Being translated, please wait..
