Results (
English) 1:
[Copy]Copied!
-The construction team: consisting of the 1st Division, group 2, group 3, group 4, group 5 team team Should ensure compliance with correct technical drawing construction to avoid the lack of materials that increase the cost of production per unit, the team also needs to enhance the spirit of savings to reduce the costs incurred in their team.
Being translated, please wait..
