Results (
English) 2:
[Copy]Copied!
Dear Anh Dat,
I send files GROUND POSITIONING He STRUCTURE STOREY TOWER S6 including sections 6-10 through stairs. I sent drawings to the construction site signed by the investor considering but has not yet received a response, so I do not dare to make the design or manufacture anything.
Thanks to the British review can send drawings to design the stairs or not, thank the UK,
Being translated, please wait..
