Results (
English) 2:
[Copy]Copied!
All work items are approved in Decision No. 26 / QD-BHH-DAMD dated 10.02.2012 approved the construction drawing design and total cost estimate will be fully implemented on schedule was the Owner approved, in accordance with the technical standards specified by the design and quality assurance as required.
In the construction process does not occur occupational accidents, comply with the regulations on fire prevention and compliance regulations on environmental management during construction.
technical criteria required in the design and the quality
Being translated, please wait..
