Results (
English) 2:
[Copy]Copied!
6) Directors should not put too high heat versus cold Department
- For machines with a capacity 18000BTU - 24000BTU. Not more than 10m.
- Requirements for the location and installation cold Departments
- Department Erection of walls very cold certainty and balance to avoid vibration.
- airflow in and out unimpeded to gas can melt through the room.
- Do not install indoor units where direct sun shine in.
- Insert the cold Department in place can be connected to an external heat Department easiest way.
- Installation of cooling block where sewer lines can be installed easily easy and air filter can be removed for maintenance, cleaning frequently.
- Cold water discharge in local slopes right.
Being translated, please wait..
