Dear Mr. Hung - Director of Operations, in case reason does not change the depth of the machine construction SCP 2 can not replace existing 150kW hammer as requested by the Steering Board, in case can shorten the depth SCP, the machine No. 1 and No. 3 can be constructed and Unit 1 can finish the process of SD at Km15 within 5 days. Therefore FCC proposal withdrawn prematurely unit 2 technical reasons and economic. FCC expects to receive his approval and Steering Board.