Results (
English) 2:
[Copy]Copied!
Process engineering service for the passengers from the chamber when guests come to stay until the guests left the hotel include 3 stages.
Stage 1: Preparing suites welcome guests
Stage 2: Serving guests during their stay
Phase 3: Preparing for a room and left the hotel.
1.5.2. Room cleaning procedures:
1.5.2.1. Processes in living room:
B1: check availability
B2: notify your presence by knocking door and confess list
B3: if guests reply, ask your visitors never make room
B4: if you do not pay Say, just quietly open
B5: if guests are in the room, apologized and left the room
B6: if guests went out to the garage to push in front and started cleaning
B7: if guests return while cleaning room is room for permission to continue doing. If you do not agree, never asked if the room could be
B8: please check the room key allows a clever way to ensure the right hotel room at
1.5.2.2. Living room cleaning procedures are staying
B1: in rooms (implementing processes in living room)
B2: open electric switch
B3: Cold shutdown (if clients have out)
B4: draw curtains open for ventilation
B5 : bring food service tray outside to enter the place where qy
B6: dump, wash ashtrays, cups, cup
B7: garbage
B8: sweep the floor
B9: do follow standards prescribed bed
B10: dusting by from top to bottom, from left to right or vice versa
B11 supplements offers rows
B12: bathroom hygiene standards prescribed
B13: toilet balcony, Watering
B14: close windows, balcony, curtaincall
B15: mopping the floor
B16: open freezer
B17: check last general
B18: turn off power switch
B19: out of the room, close the door, check the locks
B20: record the information in the book include: the switched fabrics, equipment damaged instruments need repair, the visitors used items in the minibar
1.5.2.3.Quy bathroom toilets
B1: open fans and lights
B2: check and bring Dirty towels put out dirty cloth shopping bags
B3: garbage
B4: scrub and dry the tub. Check shower to shower right position
B5: scrub and dry toilet sine
B6: scrub and dry the hand sink. Check faucet hot and cold water. Wipe the soap shelf and mirror
B7: wipe tiles and fixed objects such as telephone, towel price gutters, electrical appliances, the bathroom door ...
B8: additional supply line
B9: reset towel Clean
B10: wipe deck
B11 test last general
1.5.2.4. Workflow bed
B1: examine mattress
B2: Extra protective mattress cover
B3: First cover sheet from the surface to turn up on the four edges are coated
B4: Monday cover sheet from the reverse spin up on
B5: duvet cover plate and pull the mattress on top of a 10cm head
B6: remnants of the sheet folding up the second panel opposite folded down duvet and the bed 30 to 40 cm, tons of excess entire bottom mattress sheets. 45 or 90 degree angle breaking
B7: wear pillowcase and put it on the bed leaning
B8: Decorative pillows placed against my knees are
B9: put decorative plate
B10: check revise the upright
Being translated, please wait..
